Plan around the whole server retirement
Your PowerEdge clearout may span several generations, with rack servers, tower systems, and spare components in the same room. Include the older units alongside the more recent equipment. The model examples below help describe the range; they are not a requirement that every system match a listed configuration.
Tell us whether the servers are still in a rack, already removed, or held at more than one site. Include loose drives, memory, rails, and other hardware in the description. We confirm what is included and how the collection will work before the job.
